A. The following fee tables include the fees that the Planning and Public Works Department will charge for project review, inspection, and application/permit processing. Review fees must be paid at the time of application or in accordance with the provisions of this Chapter. Inspection fees shall be paid prior to permit issuance or prior to performance of the inspection. The Planning and Public Works Department will not begin review or begin inspections until the applicable fees are paid. Other departments and agencies may have fees and/or applications that are also required but are not included in this Chapter.

B. When provided for in the fee tables, the F1 fee shall be required at time of application. The F2 fee shall be required prior to the scheduling of a hearing, issuance of an Administrative Decision, approval of a building permit, Written Order or Staff Report; in the case of a Comprehensive Plan amendment, within 10 working days after the amendment is initiated by the County Council, or in the case of Tax Abatement Review, at the time the Resolution is forwarded to the County Council. The F3 fee shall be required for verification of compliance with a Hearing Examiner's decision, Administrative Determination, Written Order, or Council Action. If an applicant fails to pay the required fee as specified by this Chapter, staff will be unable to proceed with the review of an application(s), and this will result in the expiration and cancellation of an application(s). For Comprehensive Plan amendments, failure to pay the F2 fee within the specified time will result in the cancellation of the application.

Table 2.05.040-1. Use Permits

Type

2024 Fee

2025 Fee

Administrative Use Permit Staff Review

Initial (F1)

$2,525.00

$2,625.00

Administrative Decision/Hearing (F2)

$780.00

$810.00

Use Permit with Public Hearing

Initial (F1)

$4,540.00

$4,720.00

Admin Decision/Hearing (F2)

$2,930.00

$3,045.00

Compliance with Decision (F3)

$930.00

$965.00

Minor Amendment to Approved Use

$2,185.00

$2,270.00

Major Amendment to Approved Use

Initial (F1)

$2,900.00

$3,015.00

Admin Decision/Hearing (F2)

$2,270.00

$2,360.00

Compliance with Decision (F3)

$690.00

$720.00

Administrative Use Permit Associated with a One- or Two-Family Dwelling on an Individual Lot

Initial (F1)

$1,855.00

$1,930.00

Admin Decision/Hearing (F2)

$780.00

$810.00

Compliance with Decision (F3)

$0.00

$0.00

Use Permit with Public Hearing Associated with a One- or Two-Family Dwelling on an Individual Lot

Initial (F1)

$1,855.00

$1,930.00

Admin Decision/Hearing (F2)

$1,705.00

$1,775.00

Compliance with Decision (F3)

$480.00

$500.00

Minor Amendment to Approved Use for a One- or Two-Family Dwelling on an Individual Lot

$1,390.00

$1,445.00

Major Amendment to Approved Use for a One- or Two-Family Dwelling on an Individual Lot

Initial (F1)

$1,400.00

$1,455.00

Admin Decision/Hearing (F2)

$1,190.00

$1,240.00

Compliance with Decision (F3)

$1,090.00

$1,135.00

Land Use Time Extension

$1,250.00

$1,300.00

Exemption from Substantial Development Permit (water dependent development including bulkheads and docks)

$480.00

$575.00

Exemption from Substantial Development Permit (non-water dependent development or as determined by the Director)

$200.00

$200.00

Shoreline Use Permit without Public Hearing

Initial (F1)

$2,320.00

$2,415.00

Admin Decision (F2)

$1,610.00

$1,675.00

Compliance with Decision (F3)

$990.00

$1,030.00

Shoreline Use Permit with Public Hearing

(refer to Table 2.05.040-10 for Shoreline Variance)

Initial (F1)

$2,735.00

$2,845.00

Hearing (F2)

$1,795.00

$1,865.00

Compliance with Decision (F3)

$1,080.00

$1,125.00

Revision to Shoreline Permit

$2,495.00

$2,595.00

Sewer Land Use Review

$360.00

$430.00

Table 2.05.040-2. Platting

Type 

2024 Fee 

2025 Fee

Formal Plat

Preliminary Plat 1 to 20 lots

Initial (F1)

$3,535.00

$3,675.00

Admin Decision/Hearing (F2)

$2,810.00

$2,920.00

Preliminary Plat greater than 20 lots

Initial (F1)

$6,835.00

$7,110.00

Admin Decision/Hearing (F2)

$5,510.00

$5,730.00

Sewer Preliminary Plat Review Fee

$580.00

$605.00

Phased Development

$1,770.00

$1,840.00

Final Plat

$5,615.00

$5,840.00

Formal Plat Alteration

$2,080.00

$2,165.00

Formal Plat Alteration with Hearing

Initial (F1)

$2,200.00

$2,200.00

Admin Decision/Hearing (F2)

$1,800.00

$1,800.00

Short Plat/Large Lot

Short Plat/Large Lot

Initial (F1)

$2,280.00

$2,735.00

Admin Decision/Hearing (F2)

$2,290.00

$2,380.00

Sewer Short Plat/Large Lot Review Fee

$580.00

$605.00

Final Short Plat/Large Lot

$2,650.00

$2,755.00

Short Plat/Large Lot Alteration

$1,925.00

$2,000.00

Binding Site Plan

Binding Site Plan

Initial (F1)

$4,430.00

$4,430.00

Admin Decision/Hearing (F2)

$675.00

$700.00

Binding Site Plan Alteration

$3,000.00

$3,000.00

Miscellaneous

Lot Combination

$635.00

$660.00

Boundary Line Adjustment (BLA)

$2,420.00

$2,515.00

BLA, Lot Combination (sewered, other jurisdiction)

$430.00

$385.00

BLA, Lot Combination (non-sewered, other jurisdiction)

$225.00

$205.00

Major Amendment

Initial (F1) 

$2,900.00 

$3,015.00

Admin Decision/Hearing (F2) 

$2,270.00 

$2,360.00

Compliance with Decision (F3) 

$690.00 

$720.00

Minor Amendment

$2,185.00 

$2,270.00

Extension Request

$1,435.00

$1,490.00

Sewer Review of Final Subdivision – Sewered Property

$895.00

$930.00

Sewer Review of Alteration, Amendment or Revision – Sewered Property

$755.00

$785.00

Sewer Review of Final Subdivision, Alteration, Amendment or Revision – Non-Sewered Property

$360.00

$410.00

Table 2.05.040-3. State Environmental Policy Act Review (SEPA)

Type 

2024 Fee 

2025 Fee 

Environmental Review SEPA Determination

$1,435.00

$1,490.00

SEPA Public Agency Non-Project Review

$460.00

$480.00

SEPA Agricultural/One or Two Dwelling

$770.00

$800.00

Review of Environmental Impact Statement (EIS)

Initial (F1)

$15,600.00

$16,225.00

Draft EIS (F2)

$20,800.00

$21,630.00

Final EIS (F3)

$15,600.00

$16,225.00

Environmental Impact Statement Hourly Rate

$170.00

$175.00

SEPA Addendum

$870.00

$1,045.00

Table 2.05.040-4. Residential Development

Type 

2024 Fee 

2025 Fee

Planning Review Associated with Building Permits

Building Permit

$360.00

$430.00

Demolition Permit

$150.00

$180.00

Accessory Dwelling Unit

$550.00

$660.00

Renewal of Temporary Dwelling Unit Residential

$140.00

$170.00

Site Plan Review

$555.00

$500.00

Engineering Review Associated with Building Permits

Driveway Approach Permit

$230.00

$240.00

Abbreviated Plan – Basic

$725.00

$755.00

Abbreviated Plan – Lot of Record

$1,300.00

$1,480.00

Drainage Control Plan

$1,975.00

$2,055.00

Geological Assessment – Letter

$250.00

$260.00

Geological Assessment – Evaluation

$545.00

$565.00

Geological Assessment – Report

$1,040.00

$1,080.00

Sewer Plan Review

Platted Lot (Base Fee)

$105.00

$110.00

Lot of Record (Base Fee)

$210.00

$220.00

With private pump station and force main

$1,550.00

$1,765.00

Sewer Inspection

Base Fee

$275.00

$315.00

With private pump station and force main and/or new sewer tap (each)

+ $365.00

+ $380.00

Table 2.05.040-5. Commercial Site Development (On-Site)

Type 

2024 Fee

2025 Fee

Review

Driveway Approach

$395.00

$450.00

Drainage Plan Review Abbreviated

(<5,000 square feet of impervious surface)

$1,510.00

$1,570.00

Small Development

(5,000-25,000 sf imp., <25,000 cubic yards)

$3,120.00

$3,245.00

Medium Development

(25,001-200,000 sf imp., >25,001cy)

$5,200.00

$5,410.00

Large Development (>200,001 sf imp.)

$6,240.00

$6,490.00

Road Construction (Public or Private)

Shared Access and Alley (Base Fee)

$2,850.00

+$3.10/LF

$2,965.00

+$3.10/LF

Commercial Building Sewer (Base Fee)

$150.00

$150.00

With Private Pump Station and Force Main

+ $2,160.00

+ $2,590.00

With Sewer Tap

+ $215.00

+ $260.00

With Grease Interceptor

+ $2,095.00

+ $2,515.00

With Oil-Water Separator

+ $2,280.00

+ $2,735.00

With Misc. Pretreatment Device

+ $2,160.00

+ $2,590.00

With Easement

+ $420.00

+ $505.00

Sewer Line Extension

0 to 2,500 LF

$5,950.00

$7,140.00

2,501 LF and Greater

$9,860.00

$10,255.00

With Public Pump Station

+ $2,745.00

+ $2,855.00

With Private Pump Station

+ $340.00

+ $355.00

With Low-pressure System

+ $700.00

+ $730.00

With Latecomer Agreement

+ $980.00

+ $1,020.00

Revision to Approved Plan – Minor

$520.00

$540.00

Revision to Approved Plan – Major

$1,145.00

$1,190.00

Inspection (*Annual Fee)

Drainage Plan Review Abbreviated

(<5,000 square feet of impervious surface)

$570.00*

$595.00*

Small Development

(5,000-25,000 sf imp., <25,000 cubic yards)

$1,770.00*

$1,840.00*

Medium Development

(25,001-200,000 sf imp., >25,001cy)

$3,640.00*

$3,785.00*

Large Development (>200,001 sf imp.)

$6,240.00*

$6,490.00*

Road Construction (Public or Private)

Shared Access and Alley (Base Fee)

$2.85/LF*

$2.90/LF*

Commercial Building Sewer (Base Fee)

$280.00

$280.00

With Private Pump Station and Force Main

+ $1,210.00

+ $1,450.00

With Sewer Tap

+ $985.00

+ $1,180.00

With Grease Interceptor

+ $515.00

+ $620.00

With Oil-Water Separator

+ $535.00

+ $640.00

With Misc. Pretreatment Device

+ $535.00

+ $640.00

Sewer Line Extension

0 to 2,500 LF

$5,710.00

$6,850.00

2,501 LF and Greater

$10,090.00

$10,495.00

With Public Pump Station

+ $13,520.00

+ $14,060.00

With Private Pump Station

+ $5,200.00

+ $5,410.00

With Low-pressure System

+ $1,250.00

+ $1,300.00

Monitoring

Drainage Plan Review Abbreviated

(<5,000 square feet of impervious surface)

$375.00

$390.00

Small Development

(5,000-25,000 sf imp., <25,000 cubic yards)

$685.00

$710.00

Medium Development

(25,001-200,000 sf imp., >25,001cy)

$1,405.00

$1,460.00

Large Development (>200,001 sf imp.)

$1,950.00

$1,950.00

Road Construction (Public or Private)

Shared Access and Alley (Base Fee)

$455.00

+$0.20/LF

$520.00

+$0.20/LF

Table 2.05.040-6. Commercial Site Development (Off-Site)

Type 

2024 Fee

2025 Fee

Review

Off-site Public Road Improvements (Base Fee)

$3,000.00

+$3.10/LF

$3,600.00

+$3.20/LF

Minor Improvement in Existing County Right-of-Way

$875.00

$910.00

Sewer Line Extension

0 to 2,500 LF

$5,160.00

$5,365.00

2,501 LF and Greater

$8,650.00

$8,650.00

With Public Pump Station

+ $2,745.00

+ $2,855.00

With Private Pump Station

+ $340.00

+ $355.00

With Low-pressure System

+ $700.00

+ $730.00

With Latecomer Agreement

+ $980.00

+ $1,020.00

Revision to Approved Plan – Minor

$520.00

$540.00

Revision to Approved Plan – Major

$1,145.00

$1,190.00

Inspection (*Annual Fee)

Off-site Public Road Improvements (Base Fee)

$2.80/LF*

$2.90/LF*

Minor Improvement in Existing County Right-of-Way

$720.00

$750.00

Sewer Line Extension

0 to 2,500 LF

$5,710.00

$6,850.00

2,501 LF and Greater

$10,620.00

$12,750.00

With Public Pump Station

+ $13,520.00

+ $14,060.00

With Private Pump Station

+ $5,200.00

+ $5,410.00

With Low-pressure System

+ $1,250.00

+ $1,300.00

Monitoring

Off-site Public Road Improvements (Base Fee)

$1,800.00

+ $1.05/LF

$2,160.00

+$1.10/LF

Minor Improvement in Existing County Right-of-Way

$405.00

$420.00

Table 2.05.040-7. Engineering Studies and Special Review

Type 

2024 Fee 

2025 Fee

Gate Construction Permit – Non-Residential (Includes inspection)

$840.00

$875.00

Gate Construction Permit – Residential (Includes inspection)

$180.00

$180.00

Traffic Signal

$2,650.00

$2,755.00

Minor Industrial User (Base Fee)

$1,030.00

$1,070.00

With New or Revised Accidental Spill Prevention Plan

+ $415.00

+ $430.00

Significant Industrial User (Base Fee)

$1,870.00

$1,945.00

With New or Revised Accidental Spill Prevention Plan

$570.00

$595.00

With New or Revised Industrial Wastewater Discharge Permit

$2,390.00

$2,485.00

Waiver Request Review

$180.00

$185.00

Water Sub-metering Plan Review

$1,090.00

$1,135.00

Revision to Approved Plan

$625.00

$650.00

Basin Plans and Easements

$1,455.00

$1,515.00

Conceptual Drainage Plan Review

$965.00

$1,005.00

Traffic Impact Analysis up to 44 peak hour trips and Access Only

$940.00

$980.00

Traffic Impact Analysis greater than 44 peak hour trips (per peak hour trip)

$30.00

$35.00

Table 2.05.040-8. Critical Areas – Environmental Constraints

Type 

2024 Fee 

2025 Fee

Wetlands, Fish & Wildlife Species, and Habitat Conservation Areas

Wetland Delineation Report

Base fee (0-1 acre)

$2,050.00

$2,130.00

Per Acre Fee (greater than 1 acre)

$480.00

$575.00

Habitat Assessment Field Review

Base fee (0-1 acre)

$1,455.00

$1,515.00

Per Acre Fee (greater than 1 acre)

$70.00

$85.00

Non-Compensatory Mitigation Plan

$1,585.00

$1,900.00

Single Family Wetland Certification

$490.00

$510.00

Fish and Wildlife and Wetland Specialists, Qualification Review

$120.00

$145.00

Compensatory Mitigation Plan Review

$2,125.00

$2,425.00

Habitat Assessment Review – Letter

$1,010.00

$1,210.00

Habitat Assessment Review – Study

$1,320.00

$1,585.00

Habitat Assessment Review – Report

$1,500.00

$1,800.00

Hazard Tree in Critical Area Report Review

$910.00

$1,090.00

Verification, Wetland or Water Type Review

$1,320.00

$1,585.00

Wetland Analysis Report Review

$2,080.00

$2,165.00

Wetland Delineation Report Review

$1,480.00

$1,540.00

Landslide, Earthquake, Mine, Erosion and Volcanic Hazard Areas

Geological Assessment Review – Letter

$250.00

$260.00

Geological Assessment Review – Evaluation

$545.00

$565.00

Geological Assessment Review – Report

$1,040.00

$1,080.00

Flood Hazards

Flood Study – Coastal

$1,200.00

$1,440.00

Flood Study – Riverine

$2,760.00

$3,310.00

Flood Boundary Delineation Survey/Elevation Certificate

$485.00

$580.00

Table 2.05.040-9. Forest Practices

Type

2024 Fee

2025 Fee

Class IV General Permit

$1,320.00

$1,505.00

Conversion Option Harvest Plan (COHP)

$2,110.00

$2,195.00

Reforestation Inspection/Bond Release

$495.00

$515.00

Verification of Development Moratorium (Office)

$215.00

$225.00

Verification of Development Moratorium (Field)

$625.00

$650.00

Request for SF Dwelling Exception

$1,000.00

$1,040.00

Danger/Hazard Tree Removal in Open Space/Natural Buffer Area

$230.00

$275.00

Table 2.05.040-10. Miscellaneous Decisions, Determinations and Fees

Type 

2024 Fee 

2025 Fee

Appeals

Administrative Appeal

$1,725.00

$1,555.00

Code Enforcement Administrative Decision Appeal

$250.00

$250.00

Customer Information

Customer Information Meeting

$500.00

$520.00

Customer Information Field Visit

$345.00

$360.00

Customer Information Formal Letter

$520.00

$540.00

Project Meetings (exceeding more than 2 per project per year)

$545.00

$565.00

Inspections

Miscellaneous Inspection and Re-inspection

Residential

$240.00

$290.00

Non-Residential

$360.00

$410.00

Land Use

Zoning Certification Letter

$250.00

$300.00

Non-Conforming Use Confirmation Letter

$1,980.00

$1,980.00

Accessory Element Inspection/Bond Release Inspection

$880.00

$880.00

Development Agreement – Project and Non-Project

$4,680.00

$4,865.00

Project Master Plan, 5 Year Update

$3,100.00

$3,100.00

Minor Amendment to unlisted use permit

$1,585.00

$1,900.00

Modification to an Application

$1,140.00

$1,025.00

Hearing Examiner Reconsideration Request

$990.00

$1,030.00

Reasonable Use Exception

$2,600.00

$2,705.00

Relinquishment of Land Use Plat

$360.00

$430.00

Revocation of Land Use Plat

$4,995.00

$4,495.00

Commercial Site Plan Review

$1,600.00

$1,600.00

Long Range Planning

Comprehensive Plan Amendment

Initial (F1)

$570.00

$650.00

County Council Initiated (F2)

$2,500.00

$2,500.00

Other

Change Order

$205.00

$235.00

Commercial/Industrial Building Permit (Planning Review)

$850.00

$1,020.00

Commercial/Industrial Demolition Permit (Planning Review)

$120.00

$145.00

Commercial/Industrial Building Permit (Engineering Review)

$185.00

$190.00

Director Decision/Determination

$1,380.00

$1,380.00

Exempt Well Administration Fee

$500.00

$500.00

Expedited Review (at discretion of Director)

During Regular Business hours (per hour)

$270.00

$280.00

Outside of Regular Business Hours (per hour)

$405.00

$420.00

Site Specific Sewer Information Letter

$250.00

$300.00

Segregation Review (Subdivision Code Exempt Division)

$145.00

$175.00

Tax Abatement Review

Initial (F1)

$705.00

$735.00

Resolution to Council (F2)

$1,420.00

$1,280.00

Compliance with Decision (F3)

$300.00

$300.00

Annual Monitoring

$145.00

$175.00

Temporary Use Special Event Permit

$1,425.00

$1,480.00

Temporary Use Special Event Permit – Renewal

$625.00

$625.00

Temporary Use Permit Event (for Non-Profit-Community Based Events)

$300.00

$360.00

Temporary Use Permit Event Renewal (for Non-Profit-Community Based Events)

$120.00

$145.00

Transfer of Development Rights (TDR) Qualification of Sending Site

$745.00

$895.00

Reassessment of Sending Site

$320.00

$335.00

Resubmittal

Legal Document Resubmittal

$115.00

$130.00

Resubmittal Fee – Permit fee $500 or less

$90.00

$110.00

Resubmittal Fee – Permit Fee $501 or greater

$370.00

$445.00

Variance and Deviation

Variance and Deviation – Administrative

$1,870.00

$2,245.00

Variance with Public Hearing 

Initial (F1)

$2,735.00 

$2,845.00

Hearing (F2)

$1,795.00 

$1,865.00

Compliance with Decision (F3)

$1,080.00 

$1,125.00

Zoning Review for Business License

$190.00

$230.00

C. The following are rules for application of the fees contained in the above tables:

1. Notes for the Use Permit Table.

a. Use Permit with Public Hearing includes Conditional Use Permit, Public Facility Use Permit, Planned Development District, Planned Unit Development, Non-conforming Use and Rezone.

b. Shoreline Use Permit without Public Hearing includes Administrative Shoreline Conditional Use Permit and Shoreline Substantial Development Permits.

c. Only 50 percent of the F1 and F2 Use Permit with Public Hearing fee for a Planned Development District (PDD) application shall be paid when a PDD application is submitted in conjunction with a Formal Plat. The F3 fee shall not be required.

d. In determining the fees for a project reviewed under Title 18S PCC that requires multiple shoreline applications, to include any combination of Shoreline Substantial Development Permit, Shoreline Conditional Use Permit, or Shoreline Variance (see Table 2.05.040-10), the highest application fee shall be paid at 100 percent and 30 percent of the fee(s) for all other required shoreline applications.

e. The review fees for private mooring buoys and buoys and floats intended for public safety or information purposes shall be waived.

f. In determining the fees for a project qualifying as Restoration and Enhancement as defined in PCC 18S.40.110 that requires an Exemption Permit and an Administrative Conditional Use Permit, the Exemption permit fee shall be paid at 100 percent, and the Administrative Conditional Use Permit fees shall be each charged as follows:

(1) Initial F1 – 30 percent.

(2) Administrative Decision F2 – 30 percent.

(3) Compliance F3 – waived.

2. Notes for Site Development and Engineering Tables.

a. The review fees for Public Road Construction in Table 2.05.040-5 and for Off-Site Public Road Improvements in Table 2.05.040-6 each include a $0.40/LF charge. This fee covers the cost of installing any signage related to the project.

b. Revision to Approved Plans Fees in Tables 2.05.040-5, 2.05.040-6, and 2.05.040-7. The minor fee is charged for changes to details, roadway cross sections, etc. that may affect multiple sheets but do not require changes to previously approved design reports and engineering calculations. The major fee is charged for changes that affect roadway plans and profiles, storm drainage facility location and sizing, or significant changes to site grading. The major fee is charged when revisions to previously approved design reports and engineering calculations are necessary.

c. The Inspection Fee identified is an annual fee that covers the cost of inspection for site development projects between the time of permit issuance and final inspection approval. This fee must be paid prior to issuance of the permit. This fee will be charged each year until the final inspection approval is obtained. If the department decides that a project does not need a full additional year of construction inspection, the department has the discretion to charge the annual inspection fee in three-month increments. The annual site development inspection fee amount for purposes of site development permit extensions for single-family residences is $100.00.

d. Three field change order requests are included in the inspection portion of the cost of the Site Development Permit. The Change Order Fee will be charged on the fourth change order request and again on every change order request thereafter.

e. The Monitoring Fee identified in Tables 2.05.040-5, 2.05.040-6, and 2.05.040-7 is an annual fee that covers the cost of monitoring and enforcement actions for site development projects between the time of final inspection approval and the release of any and all financial guarantees associated with the project. This fee must be paid prior to final inspection approval. This fee will be charged each year until the performance monitoring phase is completed.

f. Site Development Permit review and inspection fees for road, shared access, and alley construction are measured along the centerline of the road, shared access, and alleys. The measurement is from center of intersection to center of intersection, or from center of intersection to end of cul-de-sac, or from center of intersection to end of road, shared access, or alley.

g. For commercial or industrial Site Development, the total square footage includes buildings, parking, access ways, concrete, asphalt and other impervious surfaces, as well as the total square footage of manmade "hard" pervious surfaces (pervious asphalt, pervious concrete, etc.).

h. For surface mine projects, the fees in Table 2.05.040-5 shall be based on the amount of grading and/or clearing that is necessary for construction of the site access, site stormwater facilities, vehicle parking, etc. The fee amount shall not be based on/include the cubic yards associated with the material being mined.

i. The fee in Table 2.05.040-6 for "Minor Improvements in Existing County Right-of-Way" is for the installation/construction of shoulder improvements, paved walkways, pervious concrete sidewalks, cement concrete sidewalks, culvert relocation/ installation, ditch/swale/buffer modifications, curb ramps, driveways in unopened County right-of-way, an individual traffic calming feature, low impact development drainage facilities, infiltration facilities, conveyance systems, catch basins, bus turnouts, multiple traffic calming features, roadway illumination, and curbing. This fee does not include turn lane construction, roadway widening, or roadway alignment changes.

j. The fee for a time extension on a sewer application (prior to issuance) shall be 25 percent of the original review fee.

k. The fee for a time extension on an issued sewer permit shall be 25 percent of the original inspection fee.

l. The Table 2.05.040-7 Traffic Impact Analysis fee amount for projects that generate more than 44 peak hour trips is calculated by multiplying the total number of peak hour trips times the fee per trip (i.e., fee for 100 peak hour trips is 100 x fee amount/trip).

m. The Basin Plan and Easement fee identified in Table 2.05.040-7 will be charged when a project requires processing of basin plans, updates and amendments thereto, preparation by County staff of easements and/or legal descriptions, and/or easement relinquishments.

n. The Revision of Approved Plan fee in Table 2.05.040-7 will be required when an applicant requests a design change that requires review and reapproval of a previously approved sewer line extension or commercial building sewer plan. This fee does not cover significant changes to the approved plan. Significant changes (such as changing the point of sewer connection, changing sewer drainage basin, addition of pump stations, change to pressure main, etc.) will be charged as a new submittal.

3. Lien Administrative Fee for Deferred Connection Charges. At the time of application for a sewer service permit, any owner/seller of property requesting a voluntary contractual lien for the deferral of the payment of all connection charges as provided in PCC 13.04.075 shall pay a nonrefundable fee, the amount of which shall be determined by the Director, to cover all administrative costs incurred by the department including, but not limited to, the costs for department staff to process the voluntary contractual lien document; provided, that this fee shall not exceed $250.00 unless otherwise approved by the Pierce County Council through ordinance. This fee shall be waived whenever a fee for the deferral of impact fees is collected pursuant to PCC 4A.10.080. In addition, the owner/seller shall pay the filing fees for the recording and release of the voluntary contractual lien.

4. Notes for Critical Area – Environmental Constraints Tables.

a. When an application requires both a Critical Fish and Wildlife Review and a Wetland Review, only one combined review fee equal to 100 percent of the larger fee plus 50 percent of the amount of the smaller fee shall be required.

b. When an application is submitted to verify the absence of a wetland on a property and wetlands are found, the applicant must apply for wetland delineation unless the Pierce County Environmental Biologist determines that the wetland is located over 315 feet from the proposed regulated activities. In this instance only, the delineation fee will reflect the difference between the verification fee paid and the full delineation fee. If there are impacts to a wetland or buffer, a mitigation plan application must also be submitted.

c. If the department requires a habitat assessment and a wetland application for a proposal solely because the proposal is located on lands covered by water and is not, therefore, categorically exempt from SEPA pursuant to WAC 197-11-800, the department will not charge a habitat assessment fee.

d. When multiple geological assessments (reports or evaluations) are required for a project, the total review fees may be adjusted as follows: Total fee = geological assessment with the highest fee + 50 percent of the fee for each subsequent geological assessment.

5. Exceptions, Additional Charges and Miscellaneous Notes.

a. If an applicant reapplies for an expired use permit or platting application, only 50 percent of the review fee shall be charged when:

(1) The new application is applied for within six months of the application expiration date, and

(2) The applicable regulations have not been amended and are the same as the regulations at the time of the original application.

b. Applications that are required as a result of a violation of the Development Regulations must pay all three fees, F1, F2 and F3, at time of application.

c. If an applicant/agent requests an Advisory Commission Meeting or Public Hearing before the Hearing Examiner to be rescheduled and the County has already provided notice for the meeting and/or hearing in accordance with the Pierce County Code, there shall be a new fee of 20 percent of the original land use or appeal application fee to accommodate the required readvertising. In no case shall this fee be less than $200.00 or more than $1,000.00. This provision does not change or extend the expiration of an application or any approval. Actions before the Advisory Commission or Hearing Examiner that stem from a violation are not eligible for this provision unless approved by the Director.

d. If the application(s) identified during a customer information meeting are filed within one year of the conference or meeting date, the fees paid shall be credited on the application(s).

e. The first two reviews of a legal document are included in the review portion of the cost of a development permit. The Legal Document Resubmittal Fee will be charged on the third and again on every subsequent review.

f. Comprehensive plan amendment application fees (F1 and F2 fees) shall be discounted by 50 percent where an amendment proposal is located within an existing urban growth area that is affiliated with a Potential Annexation Area (PAA) of a city or town.

g. A resubmittal fee will be charged prior to the third review (second resubmittal) and for each review (resubmittal) thereafter.

h. When multiple Reasonable Use Exceptions (RUE) are requested from an individual table, only one RUE fee is charged. When RUEs are requested from multiple tables, one RUE fee is charged per table. For example: Flood-related exception + Wetland-related exception = RUE fee x 2.

i. When both a Shoreline Variance and a Wetland or Critical Fish and Wildlife Variance are required for an application, the Wetland or Critical Fish and Wildlife Variance fee shall be reduced by 50 percent of the required fee.

j. The miscellaneous inspection fee in Table 2.05.040-10 will be charged when the County agrees to perform a site visit that is not currently covered by another application or permit.

k. The Accessory Element Inspection Fee/Bond Release Inspection identified in Table 2.05.040-10 covers the cost of two inspections. If more than two inspections are required, an additional fee shall be charged for each additional two inspections.

l. Reinspection fees as identified in Table 2.05.040-10 will be charged when an applicant has not made a reasonable attempt to prepare for inspection or for the third and each subsequent failing inspection of the same type at a given request.

m. The use of the residential Miscellaneous Inspection fee in Table 2.05.040-10 is intended to cover inspections of one single family parcel and its direct lot frontage. The Non-Residential Miscellaneous Inspection fee will be charged for all other miscellaneous inspections, including offsite road inspections.

(Ord. 2023-59s § 1, 2023; Ord. 2021-113s § 2 (part), 2021; Ord. 2021-113s § 1 (part), 2021; Ord. 2021-43s § 2, 2021; Ord. 2019-91 §§ 1, 2, 2019; Ord. 2018-79s § 1, 2018; Ord. 2017-68s § 1, 2017; Ord. 2017-12s § 2 (part), 2017; Ord. 2016-75s § 1 (part), 2016; Ord. 2015-71 § 1 (part), 2015; Ord. 2015-48s § 4, 2015; Ord. 2015-25s § 2 (part), 2015; Ord. 2014-83s § 1 (part), 2014; Ord. 2013-70s § 1 (part), 2013; Ord. 2012-68s § 1 (part), 2012; Ord. 2012-61s § 1 (part), 2012; Ord. 2012-42s § 3 (part), 2012; Ord. 2012-2s § 1 (part), 2012; Ord. 2011-80s § 2 (part), 2011)