Skip to main content
Loading…
This section is included in your selections.

A. A permit will be required on a single trip basis for each overlegal load for those who do not have an annual permit.

B. The form will be the same as that used for the authorization of house or building movements and the Planning and Public Works Director or her/his designee may, in her/his discretion, promulgate any rules and regulations as may be considered essential to the best interest of the County. Any such special requirements as may be deemed necessary shall be incorporated into the permit at the time of issuance and made an integral part thereof.

C. Annual permit holders must take out a single trip permit for each load which exceeds one or more of the annual permit limitations.

D. The applicant must submit an application for a permit prior to obtaining said permit.

E. The Planning and Public Works Director or her/his designee shall require that each applicant execute an insurance affidavit or submit such other proof of sufficient liability coverage with limits of not less than $750,000.00 or a greater amount as set by the Executive or her/his designee. The certificate of insurance must be provided by an insurance representative authorized to do business in the State of Washington.

(Ord. 2017-12s § 2 (part), 2017; Ord. 2005-118 § 1 (part), 2006; Ord. 85-55 § 1 (part), 1985; Prior Code § 46.50.120)