18H.30.030 Allowable Activities.
The following activities shall be allowed on any parcel that is subject to a development moratorium:
A. The division of land into lots, each of which is one thirty-second of a section of land or larger or 20 acres or larger; provided, the proposed division meets the minimum lot size or density requirements in Title 18A PCC.
B. Repair or remodeling within the existing footprint of existing structures.
C. Reconstruction of a structure damaged or destroyed due to fire, explosion, wind, flood, earthquake, or other similar calamity.
D. The construction of a structure typically accessory to a residence, such as a garage, greenhouse or storage building, may be permitted on a parcel up to a maximum of 576 total square feet.
E. Essential Public Facility uses specified under the Essential Public Facilities Category in PCC 18A.33.240 of the Pierce County Zoning Code.
F. A Site Development Permit application may be submitted, reviewed and approved to address any site development violations on the parcel.
G. A Wetland and/or Critical Fish and Wildlife Habitat area application per Title 18E PCC may be submitted, reviewed and approved to address any wetland and/or critical fish and wildlife habitat areas violations on the parcel.