Section 105.8 of the International Fire Code is added to read as follows:

A. 105.8 Permit Fees. A fee as specified in Table 17C.60-1 shall be charged for each required permit. Construction permit fees for fire protection systems shall be in accordance with Table 17C.10-1-F.

Table 17C.60-1. Permit Types and Fees*

Permit

Type

Fee*

Aerosol Products

Renewable

Included

Commercial (Haunted House, etc.)

Prescribed

$275.00

School (Haunted House, etc.)

Prescribed

$137.50

Battery Systems

Renewable

Included

Candles or Open Flame in Assembly Area

Prescribed

$151.25

Renewable

Included

Special Events

Prescribed

$275.00

Cellulose Nitrate Film

Renewable

Included

Combustible Dust Producing Operations

Renewable

Included

Combustible Fibers

Renewable

Included

Combustible Material Storage

Renewable

Included

Compressed Gases

Renewable

Included

Prescribed

$275.00

Construction

$275.00

Kiosks/Concession/Booths/etc.

Renewable

Included

Use Open Flame, etc.

Prescribed

$137.50

Display Liquid or Gas Filled Equipment

Prescribed

$137.50

Cryogenic Fluids

Renewable

Included

Prescribed

$275.00

Cutting and Welding

Renewable

Included

Prescribed

$137.50

Dry Cleaning Plants

Renewable

Included

Emergency Responder Communication Systems

Prescribed

$275.00

Explosives

Renewable

Included

Prescribed

$275.00

Fire Final/Inspection Only

Construction

$154.00

Fireworks Discharge (1.4G)

Prescribed

$110.00

Fireworks Display (1.3G)

Prescribed

$110.00

Fireworks Stand

Prescribed

$100.00 or fee allowed by RCW 70.77

Flammable/Combustible Liquids – Pipeline, Operate

Renewable

Included

Flammable/Combustible Liquids – Store, Handle, Use

Renewable

Included

Prescribed

$275.00

Flammable/Combustible Liquids – Remove or Abandon Tank

Construction

$275.00

(First Tank, $151.25 ea addt'l)

(Residential Heating Oil)

Construction

($151.25)

Flammable/Combustible Liquids – Tank, Piping Equipment, etc./Construct, Install, Alter, etc.

Construction

$412.50

(First Tank, $137.50 ea addt'l)

Flammable/Combustible Liquids – Tank Vehicles

Prescribed

$275.00

Flammable/Combustible Liquids – Change Contents

Prescribed

$137.50

Floor Finishing

Prescribed

$275.00

Fruit and Crop Ripening

Renewable

Included

Fumigation and Thermal Insecticidal Fogging

Renewable

Included

Hazardous Material – Store, Handle, Use

Renewable

Included

Prescribed

$275.00

Hazardous Material – Remove, Abandon, Tank

Construction

$275.00

(First Tank, $137.50 ea addt'l)

Hazardous Material – Tank, Piping, Equipment, etc./Install, alter, etc.

Construction

$275.00

(First Tank, $137.50 ea addt'l)

Hazardous Material – Change Contents

Prescribed

$137.50

High Piled Combustible Storage

Renewable

Included

Hot-Work Operations

Renewable

Included

Prescribed

$137.50

Industrial Ovens

Renewable

Included

Construction

$275.00

Inspection Only

Construction

$165.00

Liquefied Petroleum Gases – Tank – Install:

0 – 500 Gallons

Construction

$137.50

501 – 10,000

Construction

$275.00

10,001 +

Construction

$275.00

Liquefied Petroleum Gases – Dispensing

Construction

$275.00

Liquefied Petroleum Gases – Tank – Maintain

Renewable

Included

Liquefied Petroleum Gases – Tank Vehicle

Prescribed

$275.00

Liquid or Gas Fueled Vehicles/Equipment in Bldg.

Prescribed

$275.00

Lumber Yards and Woodworking Plants

Renewable

Included

Magnesium Working

Renewable

Included

Motor Vehicle Fuel – Dispensing

Renewable

Included

Construction

$137.50 per dispenser

Open Burning

Prescribed

$137.50

Organic Coatings

Renewable

Included

Pyroxylin Plastics

Renewable

Included

Refrigeration Equipment

Renewable

Included

Repair Garages

Renewable

Included

Rooftop Heliports

Renewable

Included

Spraying or Dipping

Renewable

Included

Temporary Membrane Structures, Tents and Canopies:

2,000 square feet or less

Prescribed and Construction

$137.50

2,001 square feet or more

Prescribed and Construction

$275.00

Tire-Rebuilding Plants

Renewable

Included

Tire Storage:

201 to 2,499 tires

Prescribed

$275.00

2,500 or more tires

Prescribed

$275.00

Waste Handling

Renewable

Included

Wood Products

Renewable

Included

*The word "Included" in the fee column indicates that the fees for renewable permits are included as a part of Commercial Inspection Program fees.

B. Additional Plan Review Fees. A fee will be charged for additional plan review for each resubmittal, beyond the first, to correct errors or omissions noted during a previous review or when additional plan review is required due to changes, additions or revisions of previously approved plans. The fee shall be 50 percent of the plan review fee on Table 17C.10-1-F or 25 percent of the fee on Table 17C.60-1, but in no case less than $50.00.

C. Late Submittal Fees. A fee will be charged if application for permit is made after the required application date for firework stands or less than 15 business days in advance of the event date for all other applications in Table 17C.60-1. The fee for late submittal is $100.00.

D. Reinspection Fees. Reinspection fees in accordance with PCC 17C.10.090 shall be charged when work for which inspection is called is not complete or when corrections called for are not made.

E. Investigation Fee. Whenever any work for which a permit is required by this Code has started without first obtaining the required permit, a special investigation shall be made before a permit may be issued for such work. An investigation fee, in addition to the permit fee, shall be collected whether or not a permit is then or subsequently issued. The investigation fee shall be equal to the amount of the permit fee required by this Code. The minimum investigation fee shall be the same as the minimum fee for that work but no less than $250.00 nor more than $5,000.00. The payment of such investigation fee shall not exempt any person from compliance with all other provisions of this Code nor from any penalty prescribed by law.

F. "Fire Final" Permit Fee. A Fire Final Permit shall be required when unique installations in new construction require an inspection to ensure Code compliance. The Fire Final Permit will track the inspection process to ensure compliance prior to occupancy. If multiple Inspection Only Permits are required for the same building, they shall be included in one permit and fee. A fee of $110.00 shall be charged, to include the permit(s) and inspection.

G. After-Hours Inspection Fee. After-hours inspection means an inspection authorized or required pursuant to the International Fire Code for which it is necessary for the convenience of the permittee to have an inspection conducted outside of normal business hours. The Fire Prevention Bureau shall charge an additional flat rate fee of $80.00 per hour, with one-hour minimum, with additional time to be computed in quarter hour increments, and to include travel time; provided, school sponsored events at public and private elementary and middle schools shall be exempt from the After-Hours Inspection Fee.

(Ord. 2024-528 § 1, 2024; Ord. 2023-59s § 2, 2023; Ord. 2021-46s § 1, 2021; Ord. 2016-71 § 1 (part), 2016; Ord. 2015-63 § 1 (part), 2015; Ord. 2008-107 § 2 (part), 2008; Ord. 2006-118 § 1, 2006; Ord. 2004-116 § 1, 2004; Ord. 2004-30s § 4 (part), 2004)