Skip to main content
Loading…
This section is included in your selections.

As determined by the County on a site-by-site basis, the developer shall have the option of paying to the County the anticipated costs for designing and constructing an on-site stormwater retention/detention facility including land costs as required above in-lieu-of constructing such a facility. The Manual describes the standards and conditions of this option in Volume III.

(Ord. 2008-59s § 2 (part), 2008; Ord. 99-24S § 2 (part), 1999)