Skip to main content
Loading…
This section is included in your selections.

A. The Director or designee may make determinations of technical equivalency regarding the requirements contained in this Chapter; provided, that all of the following are met:

1. The determination of technical equivalency will not otherwise result in non-compliance with minimum requirements set forth in the Pierce County Stormwater Management and Site Development Manual;

2. The determination of technical equivalency will not violate the development conditions imposed upon the project;

3. The determination of technical equivalency will produce a compensating or comparable result which is in the public interest;

4. The determination of technical equivalency will meet the objectives of safety, function, appearance, environmental protection, and maintainability based on sound engineering judgment.

B. The Director or designee shall make written findings supporting the determination of technical equivalency.

(Ord. 2015-48s § 1 (part), 2015; Ord. 2015-25s § 2 (part), 2015; Ord. 99-24S § 2 (part), 1999. Formerly 17A.10.090)