Skip to main content
Loading…
This section is included in your selections.

Within 30 days of a written request from the County Engineer or designee, each Grantee shall furnish the County Engineer or designee with information sufficient to demonstrate:

A. That Grantee has complied with all requirements of this Chapter and with the "Manual on Accommodating Utilities in Pierce County Rights-of-Way."

B. That all fees due the County in connection with the Cable Services and Cable or Telecommunications Facilities provided by the Grantee have been properly collected and paid by the Grantee.

C. That all non-confidential books, records, maps and other documents maintained by the Grantee with respect to its facilities within rights-of-way shall be made available for inspection by the County Engineer or designee at reasonable times and intervals.

D. That "as built" drawings of any work within Pierce County rights-of-way have been completed and are on file with the Grantee.

(Ord. 2022-11s § 2, 2022; Ord. 2016-9 § 2 (part), 2016; Ord. 2002-60 § 1 (part), 2002; Ord. 2000-57s § 2 (part), 2001; Ord. 96-124 § 1 (part), 1997)