Skip to main content
Loading…
This section is included in your selections.

Within 90 days, or such longer period as may be specified by the County Engineer, following written notice from the County Engineer, a utility shall, at its own expense, temporarily or permanently remove, relocate, change or alter the position of any facilities within the right-of-way whenever the County Engineer shall have determined that such removal, relocation, change or alteration is reasonably necessary for:

A. The construction, repair, maintenance, or installation of any County or other public improvement in or upon the right-of-way.

B. The operations of the County or other governmental entity in or upon the right-of-way.

(Ord. 2022-11s § 1, 2022; Ord. 2016-9 § 1 (part), 2016; Ord. 2000-57s § 1 (part), 2001; Ord. 96-128S § 2 (part), 1997)